Fee Salvage mark FEE SALVAGEPLATE SET SLV-04 / $SALVAGE
REQUEST ADVANCE
01 SURVEY view A, derelict with keeper clamp

SALVAGE DEAD
COIN FEES.

A bonded coin stops trading. Its creator fees keep accruing, unclaimed, forever. Point the fee authority at the salvage PDA, take SOL today, the keeper claims hourly and the vault pays out.

SOL CLAIMED 0.000 SINCE LAUNCH
HULLS SURVEYED 0 FILED ON PLATE 02
STAKERS PAID 0 VAULT DEPLOYING
Blueprint plate: a derelict orbital hull in three views, clamped by the keeper tug, the recovered fee stream splitting three ways
60% STAKERS 0.000 SOL
25% ADVANCE POOL 0.000 SOL
15% BURN ROUTER 0.000 SOL
FIG 1.1 derelict hull, fee port clamped. Recovered stream dimensioned and split. Figures in cyan are read live, white figures are not running yet.
02 ADVANCE curve plot, caliper adjustable

Formula on the plate: daily fees = 24h volume x 0.0005. Projected = daily x window. Advance = projected x 0.70 x exp(-window / 240). Longer window, more SOL today, worse rate.

SURVEY QUEUE0 FILED
MINT24H VOLADVANCEWINFILED BY
reading queue from the shared sheet

Public and shared. Anyone can file, the keeper surveys from the top down. Mints are validated as base58 and rendered as text.

03 SPLIT three way manifold, unequal bore
Blueprint cutaway of a three way flow splitter manifold with unequal outlet bores
FIG 3.1 claim manifold. Inlet: hourly creator fee claim. Outlets: 60 / 25 / 15.
60 / STAKING VAULT0.000 SOL
25 / ADVANCE POOL0.000 SOL
15 / BUYBACK AND BURN0.000 SOL

Fee loop: curve trade fees fund the treasury, the treasury funds advances, advances buy fee streams, claimed fees pay stakers, refill the pool and burn supply.

REVISION STRIPCLAIM AND BURN STAMPS
  1. no claims logged, keeper deploying
04 CURVE $SALVAGE bonding curve, direct
OFFICIAL CONTRACT TBA
PRICE-SOL
MARKET CAP-SOL
IN CURVE-SOL
TREASURY FEES-SOL
GRADUATION PROGRESS-

curve state: reading

BUY / SELLSLIPPAGE 1%
YOU RECEIVE-
CURVE FEE-

YOUR SALVAGE-
YOUR SOL-
05 SCHEDULE parts list and keeper elevation
PARTS SCHEDULESLV-04 / SHEET 1
A1LAUNCHown bonding curve, fees to treasury
A2CLAIM INTERVAL1 hour, keeper tug SLV-TUG-01
A3SPLIT60 stake / 25 pool / 15 burn
A4STAKING ASSETSALVAGE, receives claimed SOL
A5BURN LEGmarket buy, then burn, supply only falls
A6ADVANCE CURVE0.70 x exp(-window / 240)
STAKING VAULTDEPLOYING
YOUR BALANCE-
VAULT PDAnot deployed

The program ships before the first claim. No APR is printed here until the keeper has paid one.

Blueprint elevation of the keeper tug with exploded clamp jaw callouts
FIG 5.1 SLV-TUG-01, keeper vehicle. Clamp jaw contact faces in cyan.
  1. VIEW A File the hull. Paste the mint, read its real volume, set the window, sign the slip.
  2. VIEW B Point the fee authority at the salvage PDA. The advance lands in SOL, same block.
  3. VIEW C The keeper claims hourly. 60 to stakers, 25 refills the pool, 15 buys and burns.